CURRENT REQUIREMENTS

We are actively sourcing.

These are urgent short-term requirements. We have direct contact with the buyer’s appointed representative. Preferred contact is with owners and their directly authorized representatives.

Representative visual of Siemens SGT-800 gas turbine
ACTIVE REQUIREMENT

Siemens SGT-800 5 Units

Large-scale industrial power generation

5 Units
Condition
Brand New (2023 or newer preferred)
Power Output
54 MW per unit
Application
Large-scale industrial power generation
Direct buyer mandateWe have direct contact with the buyer’s appointed representative. Contact with owners and directly authorized representatives is preferred.
Representative visual of GE TM2500 mobile gas turbine
ACTIVE REQUIREMENT

GE TM2500 (Gen 6) or Equivalent

Fast-response, trailer-mounted mobile power

2 Units
Condition
New or low hours
Application
Fast-response, trailer-mounted mobile power
Desired Build Year
2022 or newer
Direct buyer mandateWe have direct contact with the buyer’s appointed representative. Contact with owners and directly authorized representatives is preferred.
Representative visual of Solar Mars 100 mechanical drive package
ACTIVE REQUIREMENT

Solar Mars 100 1 Unit

Double shaft mechanical drive

1 Unit
Condition
New
Configuration
Double shaft mechanical drive
Desired Build Year
2023 or newer
Direct buyer mandateWe have direct contact with the buyer’s appointed representative. Contact with owners and directly authorized representatives is preferred.
URGENT REQUIREMENT – SHORT TERMQualified offers can be reviewed immediately and handled confidentially.